Isuzu engine 4j series. Instruction - page 83
6D2 – 2 STARTING SYSTEM
STARTING CIRCUIT
6D2-2-1.tif
STARTING SYSTEM 6D2 – 3
ON-VEHICLE SERVICE
REMOVAL
Preparation
•
Disconnect Battery Ground Cable.
1. "50" Terminal
2. "30" Terminal
3. Earth Cable Terminal
4. Starter Assembly
5. Spacer (4JB1, Except cold area)
INSTALLATION
5. Spacer (4JB1, Except cold area)
4. Starter Assembly
•
Tighten the fixing bolt and nut to the specified torque
Starter Bolts and Nuts Torque
N∙m (Kg∙m/lb∙ft)
81 (8.3 / 60)
3. Earth Cable Terminal
•
Connect the earth cable terminal.
6D2-3-1.tif
6D2-3-2.tif
6D2 – 4 STARTING SYSTEM
2. "30" Terminal
•
Connect the harness connector.
1. "50" Terminal
•
Connect the battery cable terminal with starter switch
harness terminal, then tighten nut to the specified
torque.
Fixing Nut Torque
N∙m (Kg∙m/lb∙in)
9 (0.9/78)
•
Connect the battery cable.
STARTING SYSTEM 6D2 – 5
UNIT REPAIR
DISASSEMBLY
1. Lead Wire
Disconnect the lead wire from the magnetic switch.
2. Through Bolt
Remove the through bolts from the yoke.
6D2-5-1.tif
6D2-5-2.tif
6D2-5-3.tif