Isuzu engine 4j series. Instruction - page 83

6D2 – 2 STARTING SYSTEM

STARTING CIRCUIT

6D2-2-1.tif

STARTING SYSTEM 6D2 – 3

ON-VEHICLE SERVICE

REMOVAL

Preparation

Disconnect Battery Ground Cable.

1. "50" Terminal

2. "30" Terminal

3. Earth Cable Terminal

4. Starter Assembly

5. Spacer (4JB1, Except cold area)

INSTALLATION

5. Spacer (4JB1, Except cold area)

4. Starter Assembly

Tighten the fixing bolt and nut to the specified torque

Starter Bolts and Nuts Torque

N∙m (Kg∙m/lb∙ft)

81 (8.3 / 60)

3. Earth Cable Terminal

Connect the earth cable terminal.

6D2-3-1.tif

6D2-3-2.tif

6D2 – 4 STARTING SYSTEM

2. "30" Terminal

Connect the harness connector.

1. "50" Terminal

Connect the battery cable terminal with starter switch
harness terminal, then tighten nut to the specified
torque.

Fixing Nut Torque

N∙m (Kg∙m/lb∙in)

9 (0.9/78)

Connect the battery cable.

STARTING SYSTEM 6D2 – 5

UNIT REPAIR

DISASSEMBLY

1. Lead Wire

Disconnect the lead wire from the magnetic switch.

2. Through Bolt

Remove the through bolts from the yoke.

6D2-5-1.tif

6D2-5-2.tif

6D2-5-3.tif

Рассказать друзьям