Chery A series. Instruction - page 56

——Disassemble the gearshift shaft bolt by special

tools and take off compression spring and
gearshift shaft assembly.

——Disassemble the reverse gear lockup screw

(see as the arrowhead pointed).

— — Disassemble left and right output flange

cover.

——Take out the internal snap ring and dish ring,

and disassemble the output flange.

Special Tool

J-16

——Shift to 5th and reverse gear.

——Glide the synchronizer downward according

to arrowhead 1 direction and shift to 5th.

——Move the first fork downward according to

the arrowhead 2 direction and shift to reverse
gear.

——Take off fixing bolt and washer of the 5th

synchronizer by a special tool.

——Prize up the 5th fork pad and turn left the 5th

fork bushing, take off the 5th fork assembly.

— — Disassemble 5th driving gear and its

synchronizer assembly.(by special tools)

Special Tool

Special Tool

Special Tool

J-17

——Take off 5th driven gear snap ring and 5th

driven gear.

——Take off the bearing shift slice clamping bolt

behind of input shaft by a special tool.


——Disassemble the fixing bolt of transmission

front and rear housing, take off the
transmission housing and front/rear housing
gasket.


Special Tool

J-18

——Take off the fork shaft and its upper and lower

spring, take off 5th fork guide assembly,
reverse gear fork guide, 3rd-4th shift fork and
1st-2nd fork.

——Take off 4th driven gear snap ring and 4th

driven gear (by a special tool).

Special Tool

——Take off input shaft A assembly, pay attention

that the reverse gear B are not the shift.


J-19

Рассказать друзьям